Alligator Energy Limited

AGE.ASX

Energy

Uranium and Energy Metal exploration.

Market Data

Price

$0.036

+0.0%
Market Cap

$159.7M

P/E Ratio

-100000.0x

EPS

$-0.001

Div. Yield

0.00%

52-Week Change

-0.0%

Latest Earnings

Quarterly Report and Appendix 5B for 31 March 2026

24 April 2026

Alligator Energy achieved a transformational milestone in Q1 2026 by transitioning the Samphire Uranium Project from construction to Field Recovery Trial (FRT) operations, successfully commencing uranium extraction with initial results meeting or exceeding expectations (peak grades >200 mg/L U₃O₈, ~55% recovery after 39 pore volumes). The company formally initiated its Bankable Feasibility Study and strengthened its leadership structure, positioning the project toward development with multiple value catalysts expected in coming months including updated resource estimates and aggressive drilling campaigns. Key points: Successfully transitioned from pilot plant commissioning to Field Recovery Trial uranium extraction operations, marking transformational milestone for the project; Initial FRT results demonstrate strong performance with peak uranium grades exceeding 200 mg/L U₃O₈ and recovery rates (~55% after 39 pore volumes) meeting or exceeding modelled expectations; Bankable Feasibility Study formally commenced with FRT data integration expected to significantly de-risk project and enhance technical confidence of study outcomes

Recent Announcements

24 Apr 2026 Actual Results Positive

Quarterly Report and Appendix 5B for 31 March 2026

Alligator Energy achieved a transformational milestone in Q1 2026 by transitioning the Samphire Uranium Project from construction to Field Recovery Trial (FRT) operations, successfully commencing uranium extraction with initial results meeting or exceeding expectations (peak grades >200 mg/L U₃O₈, ~55% recovery after 39 pore volumes). The company formally initiated its Bankable Feasibility Study and strengthened its leadership structure, positioning the project toward development with multiple value catalysts expected in coming months including updated resource estimates and aggressive drilling campaigns. Key points: Successfully transitioned from pilot plant commissioning to Field Recovery Trial uranium extraction operations, marking transformational milestone for the project; Initial FRT results demonstrate strong performance with peak uranium grades exceeding 200 mg/L U₃O₈ and recovery rates (~55% after 39 pore volumes) meeting or exceeding modelled expectations; Bankable Feasibility Study formally commenced with FRT data integration expected to significantly de-risk project and enhance technical confidence of study outcomes

Get real-time alerts for AGE

Receive AI-powered earnings summaries and instant notifications when Alligator Energy Limited releases results.

Register Free