Advanced Energy Minerals Ltd

AEM.ASX

Materials

Industrial

Market Data

Price

$0.388

-0.0%
Market Cap

$238.7M

P/E Ratio

-100000.0x

EPS

$-0.049

Div. Yield

0.00%

52-Week Change

-0.3%

Latest Earnings

Preliminary Final Report

27 February 2026

Revenue
$0.62
+231.3% YoY
NPAT
-$28.66
-158.5% YoY
Dividend
$0.00

Advanced Energy Minerals reported FY2025 revenue of $622k (up 231% YoY) and a net loss of $28.7m, reflecting early-stage commercialisation of its HPA production facility in Canada post-IPO. The company successfully completed its ASX listing in December 2025 raising $44.8m, achieved major operational milestones including a 2,000 tpa production capacity, and has built a substantial sales pipeline of 165 projects worth US$130m, though it remains pre-profitability with significant ongoing capital expenditure and finance costs. Key points: Successfully completed ASX IPO in December 2025, raising A$44.8m at 53c per share with market capitalisation of ~A$312m; Achieved major operational milestone with completion of 50-metre tunnel kiln in May 2025, reaching 2,000 tpa production capacity; Built substantial sales pipeline of 165 projects (117 lab trials, 23 industrial trials, 12 commercial relationships) representing US$130m potential annual revenue

Recent Announcements

27 Feb 2026 Actual Results Neutral

Preliminary Final Report

Advanced Energy Minerals reported FY2025 revenue of $622k (up 231% YoY) and a net loss of $28.7m, reflecting early-stage commercialisation of its HPA production facility in Canada post-IPO. The company successfully completed its ASX listing in December 2025 raising $44.8m, achieved major operational milestones including a 2,000 tpa production capacity, and has built a substantial sales pipeline of 165 projects worth US$130m, though it remains pre-profitability with significant ongoing capital expenditure and finance costs. Key points: Successfully completed ASX IPO in December 2025, raising A$44.8m at 53c per share with market capitalisation of ~A$312m; Achieved major operational milestone with completion of 50-metre tunnel kiln in May 2025, reaching 2,000 tpa production capacity; Built substantial sales pipeline of 165 projects (117 lab trials, 23 industrial trials, 12 commercial relationships) representing US$130m potential annual revenue

Get real-time alerts for AEM

Receive AI-powered earnings summaries and instant notifications when Advanced Energy Minerals Ltd releases results.

Register Free